The PSM Memo: Eleven Stations From Arrangement to Split
How a Quartyl profit-split memorandum is built: the parties, their contributions, the pool, routine returns, splitting factors, the reconciliation that must tie, and the Partner conclusion.
A PSM memorandum divides one pool of combined profit between the parties to an arrangement. It is the method a firm reaches for when the parties are so bound up in each other’s operations that no single controlled price can be tested on its own – and unlike CUP, it has no comparables set to inherit a margin from. Everything the split rests on is stated by the preparer and computed by the engine: the parties, what each booked, what each contributed, and what each is owed routinely before anything is divided.
The rail is eleven stations, and the vocabulary that names them – and every choice inside them – is served by the platform rather than hard-coded into the screen. A station renamed at the source renames itself on the screen.
One memo, many analyses
A memo is the engagement; an analysis is one profit split inside it. Two parties, three transactions and a second period are three analyses under one memo, each with its own parties, pool, factors, versions and conclusion. The switcher at the top of the rail is the same control the CUP rail uses, and the same rule applies: the analysis you are reading is the analysis every write below addresses.
The design is saved as a whole document at once, not field by field: approach, profit measure, allocation mode, currency, the allocation period, the arrangement in words and the controlled transactions it covers. It checks the version you opened, so a form left open since somebody else moved the design fails loudly instead of overwriting their work.
Parties and transactions
Two roles exist and only two: tested party and associated enterprise. Each party row carries its jurisdiction, the nature of its relationship to the others, its ownership percentage, and the FAR written as three boxes – functions, assets, risks – with the source and the supporting document beside them.
Ownership is recorded to four decimal places, the same rule every percentage in this rail follows. A value rounded to two places on the way to the schedule would disagree with the row a reviewer reads on the screen.
Functional and contribution analysis
Above the parties, the contribution rows: what each party actually brought to the arrangement, stated in words first (“bears the entrepreneurial risk”, “supplies the manufacturing capacity”) and then, where it can be, measured – a value, a unit, and a weight source.
The unit list is deliberately short: currency, count, FTE, hours, percentage, other. The weight source is the one that matters, and it is asked on every value rather than offered: measured, benchmark and contractual are measurements; reasoned is a judgement. The difference is what makes an allocation quantitative, qualitative or hybrid – and a value with no source leaves that unanswered.
The two approaches, and why they are not interchangeable
Contribution split – the whole pool is allocated on relative contributions in one stage. Residual split – each party is remunerated routinely first, on a comparable routine basis, and only the residue is allocated on contributions to it.
The choice is not cosmetic: it decides whether the routine returns exist at all, and it is stated in the design. Both paths end the same way, and that is the point – the allocations sum to the pool exactly, party by party.
The pool: built only from the parties’ own lines
Combined profit is summed from what each party booked, read off the financial input rows one kind at a time in the order the chosen measure declares. Eight kinds are available – operating revenue, cost of sales, operating expenses, other operating income, other operating expenses, non-operating income, non-operating expense, income tax – and the measure names which of them add and which subtract.
Three measures exist and operating profit is the default, because below the operating line capital structure and tax – which the parties do not control jointly – would move the split. Each measure carries its own component list, so a schedule cannot silently change what it summed between two versions: the arithmetic a partner signed is the arithmetic the table describes.
A party that recorded nothing for a component is printed as not stated. That row is the part the schedule has to show: an absent expense line reads as a nil expense in the figures, and a reader is entitled to see that a figure rests on a line nobody entered.
Routine returns: all three figures, checked
Under the residual approach the routine figure is the single most consequential number in the schedule, so the rail records all three of base, rate and amount, and checks that the amount is what the base and rate actually give:
A row whose stated amount is not what its own base and rate produce is refused, not corrected. Silently recomputing would mean the number the reviewer quoted and the number the record keeps are different facts – the one thing a fixed calculation version cannot survive.
The rate is a percentage stated at four decimals: 4.5000 is four and a half
percent, because that is how a rate is quoted in a memo.
Five bases are offered: operating expenses, total assets, net book value of assets, operating revenue and personnel cost. Two of them – operating expenses and operating revenue – are derivable from the pool’s own rows, and when the stated base disagrees with the books the schedule prints the difference for the reviewer to weigh rather than refusing the row. A hard gate there would reject a legitimately re-based analysis (“operating expenses excluding share-based compensation”) for a defect the row’s own description already answers.
Splitting factors
A factor is a name, a label, a mode, an optional basis and an optional weight – and the per-party values that answer it. Each factor carries a short key so its values and the sensitivity scenarios can point at it.
Two rules do the real work:
- Normalisation. Each factor’s per-party values become shares adding to exactly 100. The normalised share is never stored – only the value is, and the percentage is computed from the live set every time, so a re-entered figure cannot leave a stale percentage behind.
- One unit per factor. A factor whose values ride in two units is not a factor. Adding a headcount to a spend produces a share that is arithmetically well-defined and economically meaningless.
Allocation and the reconciliation that must tie
The split allocates money without losing any of it: each share is rounded down to the display, the leftover units go to the parties with the largest discarded fractions, and every rounding effect is printed beside its party so the schedule shows the difference instead of absorbing it.
A reconciliation that “ties” only after absorbing a difference is the defect this rail refuses, because the absorbed amount would be the one figure in the schedule nobody can reproduce.
Order is part of the calculation. Parties are allocated in the order the pool gave them, and ties in the leftover ranking break on that same position, so two runs over the same figures cannot disagree.
The mode the design declares is checked against the values behind it: a factor whose values all ride on judgement is a qualitative allocation whatever the analysis has labelled itself, and the mismatch is refused. A document that calls a judgement a measurement is worse than one that admits it.
Versions, and what a calculation cannot change
Every calculation run stores an immutable version of its figures, held as exact text at the precision each was computed at. The memo, the workbook and the screen all read that stored result – nothing downstream is allowed to re-derive a single digit, and no arithmetic happens on the page.
Sensitivity: the same calculation, one figure moved
A scenario changes one or more named figures, and four kinds of figure may move:
| Kind | What it points at |
|---|---|
| Financial input | one party’s line in the pool |
| Routine base | one party’s routine base |
| Routine rate | one party’s routine rate |
| Factor value | one party’s value for one splitting factor |
The changed figure enters at the same precision the row itself stores, so a rate is still a percentage and a base is still money.
A sensitivity is not a second analysis and not an override of the first. The changes are applied to a copy and re-run, and the result is stored as another version together with the changes that produced it. The base case keeps its figures exactly and the two print side by side, so a partner can read the alternative without anybody re-keying the record it was run from.
A scenario with at least one change is required: without one it is the base case, and the base case already has its version.
Conclusion
The engine never concludes. A named Partner or Firm Admin does, against the calculation version they read, in one of three words the whole platform shares – Within, Below or Above Arm’s Length.
A position that departs from the split the calculation reports is recorded and surfaced, not blocked: the divergence reason rides into the memo, because the method’s answer and the firm’s judgement are two different statements and a memo that hides the gap between them is the weaker document.
Re-concluding on an older version reads back as stale, because the figures that version printed are no longer the memo’s. Concluding cites the standing version. A conclusion can be withdrawn; the attested position moves into the analysis’s history rather than disappearing.
The last two stations
Review, report and sign-off are the same surfaces on both rails – the ledger of comments and change requests that holds a build, and the three artefacts one build produces. They are on Memo review and sign-off and Memo deliverables.
FAQ
Why is the profit measure chosen rather than always net? Because the measure decides which lines are added, and below the operating line capital structure and tax would move a split the parties do not jointly control. The default is operating profit; the other two are there when the arrangement genuinely is about them.
Can I allocate on judgement alone? Yes – but not quietly. A factor whose values are all reasoned (judgement) makes the allocation qualitative, and a design that calls itself quantitative is refused. Say it is a judgement and the memo prints it as one.
Does a sensitivity change the memo? No. It stores another version beside the base case and leaves the base untouched. A conclusion still cites whichever version it was written against, and a partner who wants the scenario to stand has to conclude on it.
Why does the workbook show rounding differences instead of clean totals? Because a total that ties only after absorbing a difference hides the one number nobody can re-perform. The leftover quanta are printed beside the party that received them.
Is the routine return checked against the accounts? It is compared, never overridden. Where the base is derivable from the pool’s own rows, a disagreement prints as a difference for the reviewer; a stated amount that is not its own formula’s answer is refused outright.
See it working in your workspace
Sign in to run the steps above on a real study – or book a demo and we will walk the workflow end to end.
Related docs
Memo Reports: Standalone CUP and PSM Analyses
What a Quartyl Memo Report is: a standalone CUP or PSM memorandum with no benchmarking run behind it, its own five-state workflow, and the plan features that open each rail.
Read docThe CUP Memo: Nine Stations From Price to Conclusion
How a Quartyl CUP memorandum is built: the controlled transaction, the uncontrolled prices, comparability, adjustments, the range, the version ledger and the Partner conclusion.
Read doc